GovDeals logo
close  

Bid History for 1979 United States Coast Guard Ports & Water Way
Auction Start Date: 03/29/12 4:30 PM ET
Auction End Date: 04/09/12 6:00 PM ET
Asset ID: 9   Number of Bids: 37


Loading bid history...

1979 United States Coast Guard Ports & Water Way

1979 United States Coast Guard Ports & Water Way 1979 United States Coast Guard Ports & Water Way 1979 United States Coast Guard Ports & Water Way 1979 United States Coast Guard Ports & Water Way 1979 United States Coast Guard Ports & Water Way  More media
Auction Closed
High Bidder: F***A
Sold Amount: $7,900.00
Buyer's Premium (5.00%): $395.00
Total Price: $8,295.00
View Bid History
Terms and Conditions

6,841 visitors
Year Make/Brand Model VIN/Serial Title Restriction
1979 U.S. Coast Guard Ports and Water Way 32342 No
Condition Category Inventory ID
See Description Boats and Marine Supplies 2011-7
1979 United States Coast Guard Ports & Water Way.

Does not run. No trailer included.

The Displacement full load is 19,000lbs. Displacement Less cargo is 17,00lbs.   This Vessel was constructed by Willard Company of Costa Mesa California The Keel was laid in 1979. .   This Vessel has been Out Of Service for approximately 3 years and is being sold  As is condition.  

Length: 34' 6" Width: 11' 9" Draft: 44" loaded

Caterpillar diesel engine, 203 HP. # of engines: 2 Serial # (Starboard) 9L7429 Engine Type: 4 Stroke Engine needs repair

Fuel Tank Size: 200

Propeller Material/Condition: 2-3 Blade Bronze 23rh 23lh.

Date removed from service: 10-2010

Exterior: Hull Material is Fiberglass

Minor scratches and dings, no cracked glass.

Decals have been removed but impressions remain.

Emergency equipment has been removed.

Tan interior, boat holds 16 passengers.

Additional Equipment: Firefighting Pump Waterous Model CLNT-500 (Three Cylinder GM 3-53)

Contact Michael DiPascale at 856-757-7517 with any questions or to set up an inspection.

Seller InformationSeller Information
Seller Name: Camden City, NJ
Asset Contact: (Phone: 856-757-7164)
Asset Location: 520 Market St
Camden, New Jersey 08102-1300
Map to this location
PaymentPayment
Wire Transfer
Wire Transfer is the only payment option for this item. The Wire Transfer Transaction Summary page will provide payment and account information. The Wire Transfer must be completed within 5 days.
MediaMedia
1979 United States Coast Guard Ports & Water Way 1979 United States Coast Guard Ports & Water Way 1979 United States Coast Guard Ports & Water Way 1979 United States Coast Guard Ports & Water Way 1979 United States Coast Guard Ports & Water Way 1979 United States Coast Guard Ports & Water Way 1979 United States Coast Guard Ports & Water Way 1979 United States Coast Guard Ports & Water Way 1979 United States Coast Guard Ports & Water Way
Special InstructionsSpecial Instructions
Guaranty Waiver. All property is offered for sale “AS IS, WHERE IS.” Camden City, NJ (Seller) makes no warranty, guaranty or representation of any kind, expressed or implied, as to the merchantability or fitness for any purpose of the property offered for sale. The Buyer is not entitled to any payment for loss of profit or any other money damages – special, direct, indirect, or consequential.

Description Warranty. Seller warrants to the Buyer that the property offered for sale will conform to its description. Any claim for misdescription must be made prior to removal of the property. If Seller confirms that the property does not conform to the description, Seller will keep the property and refund any money paid. The liability of the seller shall not exceed the actual purchase price of the property. Please note that upon removal of the property, all sales are final.

Most items offered for sale are used and may contain defects not immediately detectable. Bidders may inspect the property prior to bidding. Bidders must adhere to the inspection dates and times indicated in the item description. Payment. Payment in full is due not later than 5 business days from the time and date of the Buyers Certificate. Payment must be made electronically through the GovDeals Website. Removal. All items must be removed within 10 business days from the time and date of issuance of the Buyer’s Certificate. Purchases will be released only upon receipt of payment as specified. Successful bidders are responsible for loading and removal and any and all property awarded to them from the place where the property is located as indicated on the website and in the Buyer’s Certificate. A daily storage fee of $10.00 may be charged for any item not removed within the 10 business days allowed and stated on the Buyer’s Certificate.

Questions and AnswersQuestions and Answers
Q: DOES THE BOAT HAVE ONE OR TWO ENGINES? IS EITHER ONE IN RUNNING CONDITION? (2/24/12 11:01 AM)
A: 2 ENGINES 1 OPERATES (3/5/12 8:54 AM)

Help Desk Hours: Monday - Friday, 8 am - 7 pm ET.
Contact us with any questions, comments or concerns.

Copyright © 2014, GovDeals, Inc. All Rights Reserved. Site Map
Liquidity Services, Inc.
govliquidation.com liquidation.com networkintl.com truckcenter.com truckcenter.com
QR code